Following the successful installation of a the new P4 Hybrid battery storage system under the supervision of Powervault’s installation team,
we are proud to announce we are now Approved Installers for Powervault products.
This particular hybrid version of the P4 was one of the very first to be installed in the country, this developed a lot of interest not only from the client, but also our installation team and from Powervault, with their design and development engineer also witnessing the installation, so he could monitor and analyse the initial system start up, operation and performance.